Program Documents

Generally, a large number of critical program plans are deliverable within 30 or 45 days of contract award.  In many cases, some of these are also deliverable in draft form with your proposal.

Canada makes significant demands on suppliers for documentation and is highly proscriptive with regards to contents, and sometimes format.  These documents are difficult enough to produce if you are a Canadian supplier, and they can pose a significant challenge for a foreign supplier.

We have written, reviewed, revised, translated and corrected all of the following documents at some point.  In collaboration with our partners and affiliates, we can help at any level with the following critical documents;

Customer Requirements

We can help you assess and fully understand the Government’s requirements expressed as:

  • Request for Proposal (RFP)
  • Statement of Work (SOW)
  • Requirements (Analysis and Decomposition/Allocation)
  • Security Requirements
  • Standard Terms and Conditions

Program and Quality Management

  • Project Management Plan (PMP)
  • Work Breakdown Structure (WBS) and Equipment Breakdown Structure (EBS)
  • Project Master Schedule
  • Quality Management Plan (QMP)
  • Configuration Management Plan (CMP) and ancillary documents
  • Electronic Information Environment (EIE) design and associated Support Plan
  • Risk Management Plan (RMP)
  • Performance Management Plan (PfMP)
  • Relationship Charter and Management Plan

Qualification and Test

  • Subsystem and System Qualification Plans (SQP) and Matrix
  • Test & Evaluation (T&E) Plans
  • Acceptance Test Procedures (ATP)

Systems Engineeing

  • Systems Engineering Management Plan (SEMP)
  • System and Subsystem Specification (SSS)
  • Human Factors Engineering (HFE) Program Plan and ancillary documents
  • System Safety and Health Hazards documents
  • Equipment Breakdown Structure (EBS)
  • Corrosion Prevention and Control Plan
  • Weight and Balance Control Plan

ILS and ISS Programs

  • ISS Program Management Plan (ISS PMP)
  • ILS and ISS Management Plans
  • Maintenance Support Plan
  • Training Program Plan and Training Needs Analysis
  • Courseware
Continue reading ...